View of the rear of the Hall with the
flat part of the new roof covered with zinc and the sloping sections
partly slated
View of Robing room showing the new roof trusses covered over with
tarpaulins
View showing new timbers in the Robing room that have replaced the old burnt
sections
View at ceiling height of the Robing room. Note the shape of the internal
structure and beams. The main horizontal beams will be exposed and plaster
board fixed to the trusses, thereby doing away with the old uneven false
ceiling.
The pitches of the new roof can clearly be seen from this angle, but from
the street view the slated part is all that can be seen which is very much
in keeping with other properties close by.
View east - showing the zinc covered flat section of the new roof. Note the
roof light which will give a small amount of natural light to the new LOI
room.
View from new LOI room showing the skylight.
The new LOI room starts to take shape
View of the new LOI room looking west. Note the opening on the left where
the access staircase will terminate. The insulation of the walls and
ceiling has just begun with many inches of rock wool/fibre glass being placed between
the joists.
View from the head of the existing staircase showing the opening to be used
for the access staircase to the LOI room
View of the Temple - looking south east. Note (1) The wall battens in place ready for the oak
paneling
(2) The dais which will extend the whole
width of the temple.
View from the Dining room looking south.
Note - A strengthening column which has had to be put into place following
safety guidance through the Architects